Converting existing classrooms into science labs and associated rooms

Read Case Study
Project
Commercial Refurbishment
location
Bosworth College, Northamptonshire
Malcolm Harris

Project description

Commercial Refurbishment with Challenging Timelines

Science Lab Bosworth College

Project Brief

  • To convert/refurbish basement classrooms and stores to three science labs, an office, and a preparation room.
  • The job was to be completed in 8 weeks over the summer holiday and the main aspect of this project was to construct lab work benches.

The Process

  • All fixtures and fittings were removed and wall and floor finishes stripped out.
  • The layout was changed by blocking up existing openings and creating news ones and one large room was divided with stud partitioning.
  • A vestibule was created off the stairs and the first fixing installed by the plumbers which included moving radiators and fitting new pipework.
  • Electricians installed the new emergency lighting and once everything was plastered and clean the vinyl flooring was laid.
  • The next process was to install the lab benches which were constructed around kitchen base units.
  • Once the benches were built the sinks, taps and counter top points were installed.
  • The carpenters continued by fixing skirtings, hanging fire doors, building shelving and fitting a small kitchen in the preparation room.
  • Sink and kitchen splash-backs were tiled and the labs, office, preparation room, hall and stairs decorated.

The Result

  • The project was completed on time with minimal disruption to the school.
  • We created three, modern, fully-equipped science labs, an office and a preparation room for the science department.

Project Testimonial

Science Lab Bosworth College

Dear Andrew and Terry,

I want to take this opportunity to express my thanks to your company for the excellent work you carried out for Bosworth Independent college during the summer.

The conversion of the existing classrooms into three laboratories was always going to be challenging, especially with in the limited window of time we gave you to complete the project, but also because of the difficult access to the rooms themselves. Myself, the management and the staff are impressed with the completed works, which were on time and budget, with minimal disruption to our Summer school schedule.

Thanks to all concerned at ATJ and I look forward to working with your company on future projects.